RESULTS OF IMPLEMENTATION OF THE PROJECT OF INTEGRATED MANAGEMENT OF RESOURCES, RISKS, RELIABILITY ANALYSIS AT ALL THE STAGES OF LIFE-CYCLE (URRAN)
Abstract
The system of Integrated Management of Resources, Risks, Reliability Analysis at all the Stages of Life-Cycle (the short name URRAN is due to abbreviation of Russian spelled project title) has been dev eloped by Research & Design Institute for Information Technology, Signalling and Telecommunications on Railway Transport (JSC NIIAS) in cooperation with its parent company JSC Russian Railways and other partners in order to create a modern technology of support of decision-making in the sphere of reliability and operation safety of railways.
Keywords
About the Author
A. M. ZamyshliaevRussian Federation
Ph.D. (Tech), head of research and technical commission on the traffic safety systems and automation of railway station processes
References
1. Patra, A. Maintenance Decision Support Models for Railway Infrastructure using RAMS & LCC Analyses, Division of Operation and Maintenance Engineering, Lulea University of Technology, 2007.
2. Patra, A. RAMS and LCC in Rail Track Maintenance, Division of Operation and Maintenance Engineering, Lulea University of Technology, 2009.
3. ГОСТ Р 54505–2011. Безопасность функцио- нальная. Управление рисками на железнодорожном транспорте. State Standard R 54505–2011. Functional Safety. Risk Management at Railways.
4. Шубинский И. Б. Структурная надежность информационных систем. Методы анализа // Журнал «Надежность», 2012. Shubinsky,I. B. Structural Reliability ofInformation Systems. Methods of Analysis [Strukturnaya nadezhnost informatsionnyh system. Metody analiza]. «Journal Nadezhnost» LLC, 2012.
5. Шубинский И. Б. Функциональная надежность информационных систем. Методы анализа // Журнал «Надежность», 2012. Shubinsky, I. B. Functional Reliability of InformationSystems.MethodsofAnalysis[Funktsionalnaya nadezhnost informtsionnyh system. Metody analiza]. «Journal Nadezhnost» LLC, 2012.
Review
For citations:
Zamyshliaev A.M. RESULTS OF IMPLEMENTATION OF THE PROJECT OF INTEGRATED MANAGEMENT OF RESOURCES, RISKS, RELIABILITY ANALYSIS AT ALL THE STAGES OF LIFE-CYCLE (URRAN). World of Transport and Transportation. 2013;(1):100-109.