FEATURES OF REGULATION OF SHUNTING OPERATIONS IN THE STATION SIMULATION MODEL
Abstract
When building a simulation model of the railway station or the junction one of its mandatory elements is duration of shunting operations. With the help of AnyLogic modeling system to assess this position it is necessary to consider the accounting method for acceleration and deceleration of shunting train in half-run. Moreover, the method used must comply with the rules of calculation adopted in the AnyLogic, requirements of existing procedures for regulation of shunting operations (taking into account emerging constraints). The article describes a way to solve this problem, satisfying these requirements. At the same time adjustment of some of the inaccuracies contained in the current method is proposed.
About the Authors
M. I. ShmulevichRussian Federation
A. E. Starikov
Russian Federation
References
1. Lin, E. and С Cheng. YardSim: A Rail Yard Simulation Framework and its Implementation in a Major Railroad in the U.S. In: Proceedings of the 2009 Winter Simulation Conference. Ed. by M.D. Rossetti, R.R. Hill, B. Johansson, A. Dunkin and R. G. Ingalls. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc., 2009, pp. 2532-2541.
2. Kozlov, RA. On methodological calculations of railway transport systems [O metodicheskih raschetah sistem zheleznodorozhnogo transporta]. Zhelez.nodoroz.hnyj transport, 2014, Iss. 12, pp. 28-32.
3. Clausen, U., Goedicke, I. (2012). Simulation of Yard Operations and Management in Transshipment Terminals. In: Proceedings of the 2012 Winter Simulation Conference.
4. Kiseleva, M.V. Simulation of systems in the environment AnyLogic: educational guide [Imitacionnoe modelirovanie sistem v srede AnyLogic: Uchebno-metod. posobie]. Yekaterinburg, UGTU-UPI publ., 2009, 88 p.
5. The AnyLogic Company. 2015. AnyLogic -Multimethod Simulation Software. http://www.anylogic. com. Last accessed 29.10.2015.
6. Petersen, E. R. Railyard Modeling: Part I. Prediction of Put-Through Time. Transportation Science, Vol. 11, 1977, Iss. 1.
7. Baugher Roger. Application of AnyLogic to Railroad Operation Analysis. Anylogic Conference, December, 2013.
8. Shmulevich, M. I., Starikov, A. E. Structure of simulation model of industrial railway stations and its implementation in AnyLogic [Struktura imitacionnoj modeli promyshlennyhzheleznodorozhnyh stand] i ее realizacijavsisteme AnyLogic]. PromyshlennyjtransportXXIvek, 2015, Iss. 1.
9. The norms of time for shunting operations carried out at railway stations of JSC «Russian Railways», regulations of the number of crews of shunting locomotives. Approvedby JSC «Russian Railways» of 08.02.2007 [Normy vremeni na manevrovye raboty, vypolnjaemye na z.helez.nodoroz.hnyh stancijah ОАО «RZhD», normativy chislennosti brigad manevrovyh lokomotivov. Utverzhdeno ОАО «RZhD» 08.02.2007].
10. Guidelines for the calculation of standards of time for shunting operations, carried out on railways. Approved by the Ministry of Railways of the Russian Federation of 03.19.1998 ]Metodicheskie ukazanija po raschetu norm vremeni na manevrovye raboty, vypolnjaemye na z.helez.nodoroz.hnom transporte. Utverzhdeno MPS RF 19.03.1998].
Review
For citations:
Shmulevich M.I., Starikov A.E. FEATURES OF REGULATION OF SHUNTING OPERATIONS IN THE STATION SIMULATION MODEL. World of Transport and Transportation. 2015;13(5):198-213.